A dairy production facility in Virginia was in need of a new flue for their boiler. Chimney Works installed an engineered flue replacement for the new boiler which was installed by a local boiler contractor. To coordinate with the boiler installation, the schedule became rather rushed. The problem was, on Wednesday morning, the flue material was still at the Schebler factory in Iowa. After some quick coordination with Schebler, they overnighted the equipment. As a result, by Friday afternoon this large vent system was fully installed in the Virginia dairy production facility!