Titan Mechanical called into the UEP/Chimney Works team to handle a complicated pool heater exhaust and intake installation in Washington, DC. Pool heaters are typically …
The challenge for this job was to design a support system that was compatible with a very old building structure. UEP developed the design layout …
Radio and television stations have a critical need for power – without a backup generator, their stations would go down when the power goes out. …
UEP supplied Enervex EPSA flue and a custom adapter to help fit the appliance for this ventilation system install. The school was satisfied with the …
A contractor partner was replacing 2 boilers in an Annandale, Virginia apartment complex and called UEP for the flue system. We did a site visit …
Chimney Works did a fantastic install of a flue system for three Fulton EDR+3000 boilers using 10” Centrotherm Innoflue. This was for a charter school …
Chimney Works was asked by our customer to replace the flues on two KN-20 condensing boilers at the Army Navy Country Club in Arlington VA. …
This project involved two large residential towers in northern Virginia with a large demand for heat. To achieve the large tower venting installation we worked …
United Energy Products was proud to do our part for the renovation and an addition on the existing Bird House building at the National Zoological …
Our Chimney Works installation team worked through challenging circumstances at Montgomery Community College Student Service Center. This difficult exhaust installation began with the three boilers …